Selasa, 09 November 2010

Instalation sanitary valve guide

Instalation sanitary valve step :
1. Your V972 valve is designed for sanitary Valve service and should be installed in a clean system. As such, strainers at the sanitary valve inlet should not be necessary.
2. Isolation sanitary valves, pressure gauges and bypass piping should be installed as indicated in the diagram to provide easier adjustment, operation and testing.
3. The valve is normally installed with the inlet vertical on the bottom, and the outlet horizontal to provide the best drainage within the valve. This is recommended only for drainage considerations and the valve will function in any orientation
4. Use caution in tightening commercial sanitary fittings. Over-tightening can cause the gasket to extrude into the flow passage. 5. In gas or vapour service, it is recommended that the outlet piping is at least one pipe size larger than the inlet. 6. Provide proper air pressure to the valve. The maximum rating of the actuator is 50 PSI. Exceeding this pressure may damage the valve and cause danger to equipment and personnel.
7. Where liquid pressure surges are severe a piping accumulator is recommended to prevent hammer.

Tidak ada komentar:

Posting Komentar